1 min readMay 29, 2019
It’s tough to get meaningful numeric results for a project like this. We did do a survey after the launch, but the goal there more than anything was to ensure we weren’t inadvertently making a mess. The results of that survey were very positive.
For technical details on the project, check out the companion post from our engineering team: https://heap.io/blog/engineering/redesigning-heap-without-a-feature-branch